How it fits the shop floor
Trace a lot the same day
Pick any lot of raw material and see on one screen what was received, which orders used it, what was delivered and to whom, what was rejected or scrapped and what is left. When a customer raises a complaint, you can tell them the same day which other dispatches used that material. See Lots and expiry.
Know why the schedule slipped
Set the month’s planned quantity for a part. ARUKZ ERP compares it with what was made and splits the gap into orders still in production, quantity never scheduled, quality rejections and machine hours lost on a work centre. See Manufacturing.
The rules you meet
GST rate and HSN
GST rate and HSN
Motor-vehicle parts under HSN 8708 are 18%; listed tractor parts are 5%. Put the HSN code on every item once and it prints on every invoice. See GST invoicing.
Job work return limits
Job work return limits
Under CGST Act s.143, inputs sent to a job worker must come back within 1 year and capital goods within 3. Moulds, dies and tools are exempt from the limit. ARUKZ ERP shows the return due date on every challan. See Job work.
ITC-04
ITC-04
Report job work movements half-yearly above ₹5 crore turnover, otherwise yearly. ARUKZ ERP builds the file from your challans. See ITC-04.
BIS steel
BIS steel
Covered steel products must carry the BIS mark under the Steel Quality Control Orders. ARUKZ ERP does not check this for you.
Try it with an auto parts example
The sample factory is an auto parts shop: a supplier, a steel lot, a BOM, two manufacturing orders, a rejection and a GST invoice. Load it in a trial to see whether the screens match how you work.What it does not do yet
- PPAP documents and SPC charts are not built.
- Customer schedules are not read by EDI.
- E-way bills are generated on the portal, not inside ARUKZ ERP; you record the number. See E-invoice and e-way bills.
Related
Quality
Inspections, rejections by lot, CAPA and gauge calibration.
Engineering and fabrication
Machine shops, foundries and forging units.