> ## Documentation Index
> Fetch the complete documentation index at: https://docs.erp.arukz.com/llms.txt
> Use this file to discover all available pages before exploring further.

# ARUKZ ERP for auto parts manufacturers

> How an auto component maker runs on ARUKZ ERP: lot-tracked steel, BOMs and work orders, rejections by lot, job work for plating and HSN 8708 GST invoices.

ARUKZ ERP fits a tier 2 or tier 3 auto component maker of 10 to 200 people that machines, presses, forges, casts or moulds parts and sends some operations out for job work. Raw material comes in as a lot, every manufacturing order records the lots it used, rejections are tied to the order and the lot, plating or heat treatment goes out on a job work challan, and the invoice carries HSN 8708 with the right GST for the customer's state. PPAP and SPC are not built yet.

## How it fits the shop floor

| On the shop floor | In ARUKZ ERP |
| - | - |
| Steel, castings or granules arrive | The purchase receipt creates a lot number for the label |
| Material is issued to a job | The manufacturing order records which lot it consumed |
| Parts go out for plating or heat treatment | Subcontract order, outward job work challan and receipt |
| Inspection finds a defect | A rejection linked to the order and the material lot, and a CAPA report if needed |
| Parts are dispatched | A delivery against the sales order |
| The invoice is raised | A GST tax invoice with HSN 8708 and CGST and SGST or IGST from the customer's state |

## Trace a lot the same day

Pick any lot of raw material and see on one screen what was received, which orders used it, what was delivered and to whom, what was rejected or scrapped and what is left. When a customer raises a complaint, you can tell them the same day which other dispatches used that material. See [Lots and expiry](https://docs.erp.arukz.com/modules/lots-and-expiry.md).

![Lot traceability screen for steel lot STEEL-2026-001: 100 received, 50 used in production, 20 delivered, 55 in stock, and the manufacturing order that used it.](https://mintcdn.com/arukz-digital/BADO9JLrifTaPGbf/images/lot-traceability-1600.webp?fit=max\&auto=format\&n=BADO9JLrifTaPGbf\&q=85\&s=f8eb04af861f1ef392ce10128cf9b7ec)

## Know why the schedule slipped

Set the month's planned quantity for a part. ARUKZ ERP compares it with what was made and splits the gap into orders still in production, quantity never scheduled, quality rejections and machine hours lost on a work centre. See [Manufacturing](https://docs.erp.arukz.com/modules/manufacturing.md).

![Production target screen: 50 planned, 25 produced, 15 still in production, 5 rejected by quality and 1.5 machine hours lost, with the reasons listed.](https://mintcdn.com/arukz-digital/BADO9JLrifTaPGbf/images/production-target-1600.webp?fit=max\&auto=format\&n=BADO9JLrifTaPGbf\&q=85\&s=6e1243fd986ccb9aa3264a2fd5e31c5f)

## The rules you meet

> [accordion] GST rate and HSN
>
> Motor-vehicle parts under HSN 8708 are 18%; listed tractor parts are 5%. Put the HSN code on every item once and it prints on every invoice. See [GST invoicing](https://docs.erp.arukz.com/gst/invoicing.md).

> [accordion] Job work return limits
>
> Under CGST Act s.143, inputs sent to a job worker must come back within 1 year and capital goods within 3. Moulds, dies and tools are exempt from the limit. ARUKZ ERP shows the return due date on every challan. See [Job work](https://docs.erp.arukz.com/modules/job-work.md).

> [accordion] ITC-04
>
> Report job work movements half-yearly above ₹5 crore turnover, otherwise yearly. ARUKZ ERP builds the file from your challans. See [ITC-04](https://docs.erp.arukz.com/gst/itc-04.md).

> [accordion] BIS steel
>
> Covered steel products must carry the BIS mark under the Steel Quality Control Orders. ARUKZ ERP does not check this for you.

## Try it with an auto parts example

The [sample factory](https://docs.erp.arukz.com/get-started/sample-factory.md) is an auto parts shop: a supplier, a steel lot, a BOM, two manufacturing orders, a rejection and a GST invoice. Load it in a trial to see whether the screens match how you work.

## What it does not do yet

* PPAP documents and SPC charts are not built.
* Customer schedules are not read by EDI.
* E-way bills are generated on the portal, not inside ARUKZ ERP; you record the number. See [E-invoice and e-way bills](https://docs.erp.arukz.com/gst/e-invoice-and-e-way.md).

## Related

> [card] [Quality](https://docs.erp.arukz.com/modules/quality.md)
>
> Inspections, rejections by lot, CAPA and gauge calibration.

> [card] [Engineering and fabrication](https://docs.erp.arukz.com/industries/engineering-fabrication.md)
>
> Machine shops, foundries and forging units.


This documentation is built and hosted on [Mintlify](https://mintlify.com), a developer documentation platform.